Services / 01 Engineer / 1.4

Cloud cost optimisation

Understand the bill, then change what drives it.

Measured before promised

The problem

Cloud invoices grow faster than the business. Resources were sized once and never revisited. Discounts, reservations and idle capacity are nobody’s job.

What you get

A line-by-line understanding of your spend, a prioritised set of changes, and the changes applied with usage measured before and after.

Scope

  • Billing and usage analysis across accounts, projects and regions.
  • Right-sizing, scheduling and storage-class recommendations.
  • Commitment and reservation modelling against observed usage.
  • Architecture changes where the cost driver is structural.
  • Tagging, budgets and alerts so the position stays visible.

Deliverables

  1. Spend baseline report with drivers identified.
  2. Change list with expected effect and risk for each item.
  3. Applied changes with measured before-and-after usage.
  4. Budget and alert configuration.

Exclusions

  • No savings figure is promised before the baseline is measured.
  • We do not take on provider contracts or billing on your behalf.
  • Application rewrites are scoped separately.